Repair work has started on Wednesday mornings burst water main outside the O'Brien's Pub in Brentford High Street.
This is the same water main that was completely repaired and replaced a year ago.
The High Street is now closed between Half Acre and Syon Lane, with access to the shops and residential properties only. The repair will take minimum 5 days.
On February 2nd the Mayor Boris Johnson switched on the laser sculpture at Watermans Theatre.
Photos
New signs have been ordered for Dock Road, to be installed in the very near future.
More Details
Following completion of the fantastic new pedestrian bridge linking Lots Ait Island to the Brentford shore, and major restoration work on the old boat building and repair facilities, the boatyard at Lots Ait will be re-opening for business in April 2012 as John’s Boat Works at Lots Ait.
Read More
On Tuesday January 10 and Wednesday 11 the Lot's Ait Footbridge was towed out and manoeuvred into the correct position between the shore of Brentford and Lot's Ait. We have now received as many as 60 photos of this event. Thank you all for helping out with this photo gallery!
The Bridge GalleryUpdated Jan 13, 8pm - If you have taken any photos of the "Bridge Activity" that you would like to share here, please email them to us. (Full size photos please!)
There are more Lot's Ait footbridge photos in Mike Mason's flickr gallery.
A few weeks ago the Hurlingham cruise boat sailed past Brentford Dock and just struggled through the shallow water at low tide, off Julius Point. I was impressed how shallow the water was for it to sail in and I checked its details.
Read more
We are sad to announce that Max Sammann long term resident of Brentford Dock died early in January 2012.
Please have look at the archived news from previous years.
2011